Plan around the actual scope, information and dependencies of your project. A stage sequence is not a fixed-duration promise.

Zeeruk International — General contractor
Zeeruk International Design: Arbol
Haq Associates: General contractor
START WITH DEPENDENCIES

What needs to happen
before what?

A programme should connect the design information, approvals, selections and preceding work needed for each package. Some activities may overlap once responsibilities and interfaces are agreed.

General planning guidance. The stages, responsibilities and deliverables for your project are defined by the agreed appointment.

SIX STAGES / PROJECT-SPECIFIC TIMING

Build the sequence
around the brief.

  1. 01

    Discovery & Consultation

    Agree what the brief needs to resolve, who makes decisions and what information is still missing.

  2. 02

    Concept & Design

    Record the selected direction and the design questions that must be resolved before detailed coordination.

  3. 03

    Planning & Technical Coordination

    Identify the information, approvals and responsible parties needed before each work package can proceed.

  4. 04

    Procurement & Preparation

    Confirm the approved selections, outstanding procurement decisions and readiness requirements for the next package.

  5. 05

    Construction & Execution

    Agree how work is reviewed, how changes are recorded and who authorises the next stage.

  6. 06

    Inspection & Handover

    Record the agreed completion position, remaining responsibilities and the information transferred to the client.

WHAT SHAPES THE TIMELINE

Make the influences
visible.

Design readiness

Unresolved layouts, specifications or specialist interfaces can affect when a package is ready to proceed.

Permissions and access

Building requirements, approvals and access arrangements can determine when work can start.

Procurement lead times

Availability, sample decisions, manufacturing and delivery need to be considered before scheduling installation.

Trade dependencies

Some tasks rely on preceding work, inspections or concealed-service coordination. Sequence matters as much as duration.

Existing conditions

Survey findings and conditions discovered during work may require review and an agreed response.

Client decisions and changes

Decision dates, authorised changes and their programme implications should remain visible to everyone involved.

A USEFUL PLANNING RECORD

Keep the next decision
clear.

Fields to discuss when agreeing a decision register
FieldWhat to record
Decision or informationThe specific selection, drawing, approval or clarification needed.
Responsible partyWho prepares it, who reviews it and who can approve it.
Needed beforeThe dependent order, work package or inspection.
Agreed dateA date set against the actual programme, with assumptions stated.
Status and impactWhat is outstanding and whether a change affects cost, scope or sequence.